Skip to content
Prefabricated Buildings by Orange Exteriors, serving Oakdale, MN

Oakdale, Minnesota

Licensed Prefabricated Buildings in Oakdale, MN

A delivered building kit assumes a clean rectangle of buildable ground, and in Oakdale that assumption is worth checking. The city came together out of two townships and kept annexing into the 1990s, so one street can front plats recorded twenty years apart. Setbacks, easements and lot depth change from parcel to parcel, and that is the first thing we look at before a frame gets ordered.

Get your estimate today

Rated 5.0 from 217 Google reviews

No obligation. We typically reply within a few hours.

  • Licensed and insuredMinnesota exterior contractor
  • 5.0 from 217 reviewsVerified on Google
  • Storm and insurance workWe handle the claim with you
  • Faith-based, locally ownedRefreshingly honest

Check the plat, then order the frame

Most Oakdale work is infill. The building is going next to something that already exists, on a lot that was platted when the townships were still filling in, and the survey usually turns up an easement nobody remembers. We pull that first. Then access: the city is framed by I-694 and I-94, which is good for getting a long load into town and less good once the truck is on a residential frontage street with parked cars and a tight radius. Inland ground here has no river valley or bluff to slow the wind, so the shell gets braced for what actually crosses it. If you are adding to a 1970s or 1980s building and want the eave lines to agree, custom metal and steel buildings give us the room to match what is already standing.

Residential exterior work by Orange Exteriors, roofing contractor serving Oakdale, MN

Prefabricated Buildings in Oakdale

What matters on an Oakdale infill site

  • One street, two plats, two rule sets

    Oakdale formed from two townships and kept annexing into the 1990s, so setbacks, easements and lot depth can change from one parcel to the next. We check the recorded plat before we place a corner.

  • Infill that keeps the yard working

    Most new buildings here go beside something already standing. We lay the footprint out so trucks still turn, doors still open and you are not left with a strip of ground nobody can use.

  • Water and snow between two buildings

    A narrow gap between a new shell and an older building becomes a snow trough and a drainage pinch. We set the sidewall spacing, the gutter runs and the grade so meltwater leaves instead of pooling.

  • Old township ground checked for fill

    Land that was farmed and annexed piecemeal can hide field tile, an old foundation or fill nobody recorded. Test pits before the pour take a morning. Finding it under a footing takes the schedule with it.

  • Roofline set to clear the existing eave

    Buildings from the 1970s and 1980s around Oakdale sit low, with boxed soffits and little room above the eave. Tying a new shell in means picking a height and slope that flash cleanly instead of fighting the old roof.

  • Long loads routed in from the interstates

    I-694 and I-94 frame the city, so the haul is easy until the last few blocks. We check the turn off the frontage road, the overhead lines and where a truck can sit without blocking a lane.

How we approach an Oakdale build

  • We measure the existing building

    An addition only works if the existing eave heights, column lines and slab elevation are measured, not assumed off an old drawing. We take those numbers ourselves.

  • Locates called before anything is dug

    Old township land holds utilities and abandoned services that are not on any plan you have. We call in locates and mark what we find before the excavator starts on footings.

  • Staging arranged with the neighbor

    Infill sites often need a corner of the lot next door for a day of unloading. We ask first, in writing, and we put the ground back the way we found it.

  • A written scope with the exclusions

    The estimate says what is included and, just as usefully, what is not: rock excavation, unsuitable soil, extra hydrant work. Surprises on a build site are almost always scope, not skill.

  • Close enough to stop by

    We work out of Eden Prairie and are in the east metro regularly. A site visit to Oakdale is a normal part of the week, not a special trip.

Prefabricated Buildings by Orange Exteriors, serving Oakdale, MN

What people near Oakdale say

  • We live in Eden Prairie. Orange did an excellent job on our siding replacement and provided great customer service all the way through.
    Thomas DeSutterSiding replacement, Eden Prairie, MN
  • Fantastic guys to work with, did an excellent job of fixing our siding. You can tell it’s a high integrity company. Definitely recommend.
    Carolyn MillerSiding repair
  • The crew arrived early and spread tarps all around the house to capture every bit of debris. By 3:00 PM, my entire roof was completely finished.
    Hazel JamesRoof replacement, Minneapolis, MN

Oakdale questions we hear

What people in Oakdale ask us about this work. If yours is not covered, call and ask.

Why does my Oakdale lot follow different rules than the one next door?

Because the city was assembled rather than platted at once. Oakdale and Northdale townships consolidated and the city kept annexing land into the 1990s, so a single street can front plats recorded twenty years apart. Setbacks, easement widths and lot depth all shift with that, which is why we pull the recorded plat before placing a building.

Can you add on to our existing building instead of building new?

Often, yes. The questions are whether the existing wall can take the tie-in, whether the eave height leaves you usable clear height inside, and how water and snow move between the two roofs. We measure the existing structure first. If the tie-in is going to cause more trouble than it solves, a separate building nearby may be the better build.

Can a long steel delivery reach a site off an Oakdale frontage road?

Usually. I-694 and I-94 make the long haul simple, and the trouble, when there is any, is in the last few blocks: a tight turn off the frontage road, low overhead lines, or parked cars on a narrow street. We drive the route before the delivery is booked and split the load onto shorter trucks when that is the answer.

Build on your Oakdale parcel

Send the address and what you need the building to hold. We will pull the plat, look at the access and walk the site with you, then write a free, no-obligation estimate.

Get Your Free Exterior Estimate

Tell us what is going on with your roof, siding, windows, or gutters. We will take a look and give you a straight answer, including when the answer is that you can wait.

Request your estimate

Rated 5.0 from 217 Google reviews

No obligation. We typically reply within a few hours.