
Elko New Market, Minnesota
Detailed Metal Roofing in Elko New Market, MN
Wind and hail arrive with nothing in front of them in Elko New Market, where the plats around Boulder Pointe golf course sit near 1,150 feet on open upland along Interstate 35, roughly 400 feet above the valley floor at Jordan. Tall gable ends on these post 2000 two story homes take it square. Standing seam handles that. Getting panels up there is the work.
Get your estimate today
Rated 5.0 from 217 Google reviews
- Licensed and insuredMinnesota exterior contractor
- 5.0 from 217 reviewsVerified on Google
- Storm and insurance workWe handle the claim with you
- Faith-based, locally ownedRefreshingly honest
Access is the constraint, not the roof
These are good roofs for standing seam. Steep pitches, long clean slopes and few interruptions mean a panel can run ridge to eave in one length, and there is no better shape for shedding snow or taking a hailstone at an angle. The catch is height. A two story home with a tall gable end and second story wall gives us nowhere to set a ladder and no easy path for a forty foot panel, so we roll panels on site, stage from the driveway side and plan lifts before the tear off starts. Fastener pattern matters more at this elevation than it does down in the river towns, so clips get tightened up along rakes and eaves. Owners here comparing upgrades also look at luxury roofing, which changes the material conversation.

Metal Roofing in Elko New Market
Why metal fits these upland homes
Full length panels, no end laps
The slopes on these Boulder Pointe area homes run long and clean, so a panel can go ridge to eave in one piece. Every lap you avoid is one less place for water to find its way in.
Steep pitch clears its own snow
Pitches out here are steep enough that snow leaves on its own once the sun hits the panel. That keeps standing load off the roof, though it means we plan where the load lands.
A steep plane takes a stone at an angle
Pitches out here are steep, so most stones arrive across the panel rather than square onto it and glance off. What takes the direct hits is the flat work: trim, vent caps and anything horizontal. We look hardest at those after a storm, because the field of the roof usually tells you the least.
Access planned before tear off
Tall gable ends and second story walls leave nowhere obvious to work from. We sort out staging, ladder points and how long panels reach the roof before anything comes off.
Golf course lots and stray hits
Homes along the course take the occasional ball. A strike leaves a cosmetic mark and nothing more on a seamed roof, and a striated panel hides it, which is worth choosing on those lots.
Long panels move, and we let them
A forty foot run of steel expands and contracts with the season. Floating clips let it, and that is why we do not pin a long panel down tight the way a short one can be.
How we run a job on a tall house
We measure the gable ends first
Panel length has to be right before steel is rolled. On a tall two story we measure from the ground and on the roof, so a forty foot run arrives at the correct length.
Licensed, insured and permitted
We pull the permit and carry the insurance, which matters more than usual on a job where people are working two stories up over a driveway and a finished yard.
We confirm the coil before it is rolled
Panel is formed in your driveway from a coil, and once it is rolled to your lengths, profile and color it belongs to your house. All four go on paper and get confirmed with you before anything is ordered, because that is the point past which nothing is changing.
We roll panels in your driveway
Long runs are formed on site rather than shipped, because a factory panel that length gets damaged in transit. Your driveway becomes the shop for a couple of days.
We watch the wind, not the calendar
You cannot carry a long panel up a tall gable in a stiff west wind without bending it or worse. We schedule the install days around the forecast on these open plats.

What people near Elko New Market say
Fantastic guys to work with, did an excellent job of fixing our siding. You can tell it’s a high integrity company. Definitely recommend.
Carolyn MillerSiding repair The crew arrived early and spread tarps all around the house to capture every bit of debris. By 3:00 PM, my entire roof was completely finished.
Hazel JamesRoof replacement, Minneapolis, MN Orange Exteriors fixed a minor leak that involved replacing flashing and a few shingles blown off our roof. Timely, quality work. Great ideas to keep our roof going long term.
Jim ThomasStorm damage repair
Questions from Elko New Market
What people in Elko New Market ask us about this work. If yours is not covered, call and ask.
Is metal a good fit for the newer two story homes in Elko New Market?
Better than most housing stock, yes. Steep pitches, long uninterrupted slopes and few dormers are exactly the shape standing seam wants, and the exposure out on the upland along Interstate 35 gives you a reason to want steel. The complication is height, not the roof itself.
How do you get long metal panels up onto a second story roof?
Carefully, and with a plan made before tear off day. Panels are rolled on site to exact length, carried up on staging set on the driveway side, and walked onto the deck by hand. On the tallest gable ends we bring in a lift rather than fight it, which is decided at the estimate.
My Elko New Market roof was already replaced after hail. Should the next one be metal?
That depends on how long you plan to stay. If your asphalt roof has been replaced once on a claim, the exposure that caused it has not changed, and a third or fourth asphalt roof is a real possibility. Metal breaks that pattern. If you expect to sell soon, the extra cost is harder to justify.
Have us look at your gable ends
We will come out to your plat, measure the runs, work out how panels get up there, and give you a written quote on standing seam with no obligation.
Get Your Free Exterior Estimate
Tell us what is going on with your roof, siding, windows, or gutters. We will take a look and give you a straight answer, including when the answer is that you can wait.
- Phone(612) 600-8529
- Emailadmin@orange-exteriors.com
- Office6600 City West Pkwy Suite 375, Eden Prairie, MN 55344
- HoursOpen 24 hours, Sunday to Saturday
Request your estimate
Rated 5.0 from 217 Google reviews
