Skip to content
James Hardie Siding Replacement by Orange Exteriors, serving Bloomington, MN

Bloomington, Minnesota

Seasoned James Hardie Siding Replacement in Bloomington, MN

The long, low walls on a Bloomington rambler or split-level fail at the bottom first, where snow piles against the grade and splashes back all spring. Fiber cement has clearance rules written for exactly that, and following them changes where the bottom course lands. Around Oxboro and West Bloomington, that is usually the conversation before color ever comes up.

Get your estimate today

Rated 5.0 from 217 Google reviews

No obligation. We typically reply within a few hours.

  • Licensed and insuredMinnesota exterior contractor
  • 5.0 from 217 reviewsVerified on Google
  • Storm and insurance workWe handle the claim with you
  • Faith-based, locally ownedRefreshingly honest

Snow decides where the bottom course lands

Behind the aluminum or hardboard on a 1958 rambler we usually find board sheathing, or on the later splits a fiberboard panel gone soft along the bottom. That gets replaced before anything hangs on it, which is why tear-off scope here runs bigger than people expect. The HZ5 detailing earns its keep where a long low roof plane meets a wall, because snow sits on those planes for months instead of shedding: the plank needs clearance above the shingles, the step flashing needs a kick-out, and the housewrap has to lap over that flashing rather than under it. Backwards, and the wall rots quietly under a finish that still looks new. If your aluminum is chalky but flat and straight, it is fair to price steel siding replacement next to this one before you decide anything.

Residential exterior work by Orange Exteriors, roofing contractor serving Bloomington, MN

James Hardie Siding Replacement in Bloomington

What changes on a Bloomington rambler

  • Clearance where the snow piles up

    Plank held off the grade, off the walk and off the deck surface is plank that is not sitting in a snowbank until April. It is a small dimension that decides whether the bottom course survives.

  • Kick-outs at every roof-to-wall

    Splits and ramblers are full of spots where a low roof runs into a wall. Without a kick-out at the bottom of the step flashing, that runoff goes behind the siding instead of into the gutter.

  • Soft sheathing replaced, not covered

    Fiberboard panel that has wicked water crumbles under a nail gun and holds nothing. We cut it out and sheathe it properly, because plank fastened to mush comes loose in a couple of winters.

  • Seams staggered on long walls

    A rambler gives you forty feet of unbroken wall, and butt joints stacked over each other will be the first thing your eye finds. We lay the courses out so the seams scatter and disappear.

  • Brick fronts tied in cleanly

    The masonry wainscot stays. We stop the plank above it with flashing and a drainage gap, so water leaving the wall lands outside the brick ledge instead of sitting on top of it.

  • Windows swapped while walls are open

    If the original aluminum windows are still in, changing them during siding work means one set of openings, one flashing detail and one round of trim, rather than cutting a finished wall open later.

Why Bloomington homeowners hand us the whole wall

  • You see photos of what we find

    When the old siding comes off and there is rot behind it, you get pictures the same day, taken from the ladder, before any of it is covered back up.

  • Repair priced before we touch it

    Sheathing replacement is quoted as its own line and approved before the saw comes out. Nobody likes hearing about extra work after it has already been done.

  • Sometimes we say keep it

    If your aluminum is straight, sound and just tired looking, we will say so. Fiber cement is not the right answer for every rambler on the block.

  • One crew, tear-off through trim

    The same people who strip the wall wrap it, hang it and finish the corners, so there is no gap where an open wall sits waiting on the next trade.

  • Estimates written from the ladder

    We measure the house, look behind the trim and check the roof-to-wall joints before writing anything down. No quotes from satellite images and a phone call.

James Hardie Siding Replacement by Orange Exteriors, serving Bloomington, MN

What people near Bloomington say

  • From sales to construction crew to upper management, they helped make an insurance battle a breeze. This is the best contractor interaction I have ever had.
    Jim NormanRoof replacement
  • Orange Exteriors did an excellent job with my new roofing install. Very professional, on time and hard working crew. Completed the job in one day.
    Dick JohnsonRoof installation
  • We live in Eden Prairie. Orange did an excellent job on our siding replacement and provided great customer service all the way through.
    Thomas DeSutterSiding replacement, Eden Prairie, MN

Questions from Bloomington homeowners

What people in Bloomington ask us about this work. If yours is not covered, call and ask.

Does Hardie plank suit a 1960s Bloomington split-level?

Yes, and the shape helps. Long low walls give you a clean run with few interruptions, and the gable over the entry is a good place to change texture. The parts to watch are the bottom of the wall at grade and the point where the low roof plane meets the upper wall, since snow sits there for months.

Only the bottom of my siding is rotting. Do I have to replace all of it?

It depends what the rest of the wall is made of. If the existing siding is a hardboard that has swelled anywhere, patching the bottom just moves the failure up a course and you will be back at it. If it is sound aluminum and only the trim boards are gone, a repair is honest work. We will tell you which one you have.

Will you have to take the brick front off my Bloomington rambler?

No. Masonry stays where it is. We terminate the plank above it with flashing and a gap so water that gets behind the wall drains out rather than pooling on the brick ledge. That transition leaks on a lot of ramblers, and it is worth correcting while the wall is open.

Book a Bloomington walk-through

Bring us out to the rambler or the split and we will check the grade line, the roof-to-wall joints and the sheathing behind the trim before quoting anything. Free, and there is no obligation.

Get Your Free Exterior Estimate

Tell us what is going on with your roof, siding, windows, or gutters. We will take a look and give you a straight answer, including when the answer is that you can wait.

Request your estimate

Rated 5.0 from 217 Google reviews

No obligation. We typically reply within a few hours.